Fangfa project scenario:
lr runs 1000 concurrent operations for 20 minutes, and some errors occur during execution
Problem description
The error message is as follows: a small number of errors are reported as follows:
Error: Two Way Communication Error: Function two_way_comm_post_message / two_way_comm_post_message_ex failed. Error: Failed to deliver a p2p message from parent to child process, reason - communication error.
Cause analysis:
Generally, there is no specific prompt information. Considering that it is a problem with the press, the concurrency is too large to handle
Solution:
Method 1: You need to modify the dat file in two locations
1. C:\Program Files (x86)\HP\LoadRunner\launch_service\dat\channel_configure.dat
2. C:\Program Files (x86)\HP\LoadRunner\dat\channel_configure.dat
Method 2: Add a press.