An error occurred: error while processing samples: mismatch between expected number of columns: 17 and columns in CSV file: 25, check your JMeter. Save. Saveservice. * configuration or check if line 46397 in ‘log. JTL’ is complete
I used many online tutorials, which were not solved and wasted time
The final solution: regenerate the log.jtl file and operate it again
1. Delete the previously generated log.jtl file first
2. Execute the command line to generate log.jtl
D:\apache-jmeter\apache-jmeter-5.4.1> jmeter -n -t pingbi.jmx -l log.jtl
3. Execute the generate chart command line
D:\apache-jmeter\apache-jmeter-5.4.1> jmeter -g log.jtl -o report1
No more errors are reported this time, and the chart is generated successfully